Get in touch with us

Call Lankelma

+44 (0) 1797 280050

E-mail

info@lankelma.com

Rapid reporting in Rugby

Monday, June 24th, 2019

Our rapid turnaround of test results gave engineers from consultant Hydrock more time to analyse data on a recent investigation in Coton Park in Rugby. Our tracked rig UK2 carried out 28 piezocone CPTs to a maximum depth of 20m through clays and silts that became very stiff at depth.

Hydrock’s Ciaran Davis said: “We were very pleased with how Lankelma communicated with us, plus we received the preliminary reports the day after testing. Additionally, we found it extremely useful to get the full report and AGS data within three working days after finishing site works, giving us plenty of time for analysis.”