Sign up to our Newsletter
News

Surf zone GI using ROV-mounted CPT
30th January 2019Lankelma mounted a Neptune CPT unit onto the ROV to enable underwater CPTs to be performed. Read more
Magnetometer testing in London
3rd January 2019The magnetometer cone was used to clear the London site for UXO ahead of other intrusive site activities. Read more
Bespoke testing solutions in Mauritius
A project to increase storage capacity of a rockfill dam called for Lankelma to mobilise a short notice to carry out CPTs in Mauritius. Read more
Seismic testing and CPT for HS2 Phase One
Lankelma developed a constant energy source to enable seismic shear wave damping analysis required for the track bed design of HS2 high speed rail. Read more
Testing off the quay wall
Lankelma’s cantilever frame was utilised to carry out cone penetration testing up to 2m from a quay wall. Read more
Mini crawler in York
The mini crawler was ideal for testing inside a warehouse where access and working area was restricted. Read more
Boston Barrier Project
As part of the £100 million Boston Barrier project, Lankelma were instructed to carry out overwater and onland site investigations. Read more
Verifying soil mixing in Finland
Canadian gold mining company Agnico Eagle Mines instructed Lankelma to carry out a specialist ground investigation in Finland. Read more
Magnetometer testing in Avonmouth
12th November 2018Efficient and cost-effective magnetometer testing to clear for UXO Read more
Edinburgh Glasgow Improvement Programme (EGIP)
250+ CPTs to a maximum of 12m depth in sands and soft, sensitive clays on the railway over 90 night shifts. Read more