Get in touch with us

Call Lankelma

+44 (0) 1797 280050

E-mail

info@lankelma.com

News

Celtic Interconnector

12th November 2018

Wireline Geobore-S drilling and push-sampling using Lankelma’s Sandpiper C-5 jack-up platform  

Magnetometer testing in Avonmouth

Efficient and cost-effective magnetometer testing to clear for UXO Read more

Edinburgh Glasgow Improvement Programme (EGIP)

250+ CPTs to a maximum of 12m depth in sands and soft, sensitive clays on the railway over 90 night shifts. Read more

Basement GI in Central London

Working in a low headroom car park, CPT was performed with the lubrication module to provide an indication of the depth to base of the London Clay.

Coastal and nearshore capability

23rd May 2018

Lankelma coastal and nearshore capability statement

Terminal Expansion, Guinea

6th August 2016

Lankelma carried out multi-disciplinary geotechnical and geophysical investigations for a jetty extension, construction of a new bauxite-handling jetty and dredging of an approach channel at a Container Terminal in Guinea.

Offshore leg penetration assessment, West Africa

Lankelma provided nearshore CPT and drilling services for the safe positioning of production platforms in the Gulf of Guinea.

Hong Kong-Zhuhai-Macau Bridge, China

Lankelma, working for Lam Geotechnics, carried out seabed CPTs for the Hong Kong-Zhuhai-Macau (HKZM) Bridge, China’s first major combined bridge and tunnel sea crossing.

Flood defence investigation, West Sussex

16th February 2015

Piezocone CPT soundings were performed to assess the ground conditions ahead of flood defence construction for the protection of a new housing development.