Case Studies
Seismic testing and CPT for HS2 Phase One
Lankelma developed a constant energy source to enable seismic shear wave damping analysis required for the track bed design of HS2 high speed rail.
Testing off the quay wall
Lankelma’s cantilever frame was utilised to carry out cone penetration testing up to 2m from a quay wall.
Verifying soil mixing in Finland
Canadian gold mining company Agnico Eagle Mines instructed Lankelma to carry out a specialist ground investigation in Finland.
Seismic CPT, Falkirk
Lankelma carried out its deepest seismic sounding at Grangemouth Refinery as part works for the FREON replacement scheme.
Download the Case StudyMIP and magnetometer testing, Stratford
Our Membrane Interface Probe (MIP) was used to assess contamination in Stratford prior to large development works.
Download the Case StudyVideocone, East London
The video cone was ideal for use in identifying a potential ‘geological anomaly’ beneath a London sewer.
Download the Case StudyMagnetometer and pressuremeter testing, Wembley
Lankelma’s lubrication module was successfully trialled at Wembley Park allowing for deeper CPT penetration in stiff clays.
Download the Case Study