Case Studies
Edinburgh Glasgow Improvement Programme (EGIP)
250+ CPTs to a maximum of 12m depth in sands and soft, sensitive clays on the railway over 90 night shifts.
Vibrating Wire Piezometer installation, Lancashire
Lankelma’s road-rail truck completed several CPTs and installed a vibrating wire piezometer within the four-foot as part of a rail stabilisation project.
Download the Case StudyRail embankment, Somerset and Hampshire
The 2014 winter weather resulted in landslips on a railway embankment which called for rapid mobilisation of Lankelma’s CPT rigs to evaluate the ground conditions.
Download the Case Study