Case Studies

Edinburgh Glasgow Improvement Programme (EGIP)

250+ CPTs to a maximum of 12m depth in sands and soft, sensitive clays on the railway over 90 night shifts.

Read more

Vibrating Wire Piezometer installation, Lancashire

Lankelma’s road-rail truck completed several CPTs and installed a vibrating wire piezometer within the four-foot as part of a rail stabilisation project.

Download the Case Study

Rail embankment, Somerset and Hampshire

The 2014 winter weather resulted in landslips on a railway embankment which called for rapid mobilisation of Lankelma’s CPT rigs to evaluate the ground conditions.

Download the Case Study