Case Studies
Boston Barrier Project
As part of the £100 million Boston Barrier project, Lankelma were instructed to carry out overwater and onland site investigations.
Terminal Expansion, Guinea
Lankelma carried out multi-disciplinary geotechnical and geophysical investigations for a jetty extension, construction of a new bauxite-handling jetty and dredging of an approach channel at a Container Terminal in Guinea.
Download the Case StudyOffshore leg penetration assessment, West Africa
Lankelma provided nearshore CPT and drilling services for the safe positioning of production platforms in the Gulf of Guinea.
Download the Case StudyHong Kong-Zhuhai-Macau Bridge, China
Lankelma, working for Lam Geotechnics, carried out seabed CPTs for the Hong Kong-Zhuhai-Macau (HKZM) Bridge, China’s first major combined bridge and tunnel sea crossing.
Download the Case StudyOverwater Project Experience
Download the Case StudyLake Maracaibo crossing, Venezuela
Lankelma’s nearshore jack-up platform, Sandpiper, completed a detailed ground investigation across Lake Maracaibo for the construction of a new 10.8km road and rail crossing.
Download the Case Study