Lankelma Green Energy offers thermal response testing (TRT)—a means of measuring the thermal conductivity of the ground.
This information is essential in the precise design of borehole heat exchangers and is recommended if the required heat load is greater than 50kW or more than 10 boreholes are required.
TRT is a complete service, independent of our GSHE installations.